تحويلة وادي عدي
Please wait...
Comment title
Write a comment
Wadi Adai Interchange Road Development 
تحويلة وادي عدي
Oman - Muscat - Wadi Adai
The project's scope of work consist of a multilevel interchange including 2-kilometre of the dual-lane bridge located in Al Amerat, Muscat, Oman. The project work includes:
    Construction of steel gantry structure rising 19 metres above ground and will be incorporated into the bridge
    Construction of 2 structural steel bridges with total weights of 2820 tonnes
    Road works including water drainage, asphalting, road lighting, safety barriers, paving and curbing, road signing and marking
    Signalized at-grade intersection
    Public utility service diversion and protection
    Access ramps
    Asphalt laying up to 16000 cubic meters
    Concrete work up to 25.000 cubic meters
Plot Number: N/A
Permit Number: N/A
Status: Existing
Add a Role!
If your organization or any other organization you know has a role in the project, please click here and mention it
Participants