The project's scope of work consist of a multilevel interchange including 2-kilometre of the dual-lane bridge located in Al Amerat, Muscat, Oman. The project work includes: Construction of steel gantry structure rising 19 metres above ground and will be incorporated into the bridge Construction of 2 structural steel bridges with total weights of 2820 tonnes Road works including water drainage, asphalting, road lighting, safety barriers, paving and curbing, road signing and marking Signalized at-grade intersection Public utility service diversion and protection Access ramps Asphalt laying up to 16000 cubic meters Concrete work up to 25.000 cubic meters